The project was awarded by University of Jos in 2015 to Zephyrgold. The project consists of the construction of a footbridge 242.25m long and made up of 17 spans of 14.25m each. The superstructure consist of two precast concrete-edge-beams of 650mm deep by 500mm spaced, 250mm apart and topped by a precast slab of 100mm in thickness as permanent walkway. The footbridge consists of two ramps approach road approximately 50m. Ancillary works done by the company include the construction of an obelisk/monument to explicitly commemorate a person or important event for the University and installation of imported Solar Powered Street Light. The project was completed and commissioned.