The construction of Emergency Repair of Embarkment washout of Chanchaji bridge involved mobilization of equipment, materials and labour to site, sub-base to 200mm compacted thickness each application of MCO/MCI where and as directed; Large retaining wall and slope stabilization along abutment length was rebuilt, regarde and backfill abutment slope to the side of the roadway, Rebuilding of the structural sidewalk/bridge class railing along west side.