Rehabilitation of Kobili Dakka Bridge Plateau State.

Rehabilitation of Kobili Dakka Bridge Plateau State.

The Bridge is designed to span continuously over three spans and they located on Ch. 0+200 to 0+253.4. The length of the respective bridges is 17.8Lm (distance between the axis line of the frontal walls of the abutments). The deck slab is 250mm thick and spans over five numbers per-cast reinforcement concrete beam girders of 15Lm long, 1.0m deep and 450mm wide. The centre to centre spacing of the pre-cast concrete girders is 2.2m wearing course, walkway, kerbs and parapets completes the deck.

 

Project Description

Client: FMPHW
Location: Kobili Dakka
Year Completed: 2019
Value: 580,878,770.08