The Repairs of damaged Element of Ethiope Bridges 1& 2 at CH37+600 along Benin-Sapele road Delta state involved mobilization of equipment, materials and labour to site, sub-base to 200mm compacted thickness each application of MCO/MCI where and as directed; Large retaining wall and slope stabilization along abutment length was rebuilt,regarde and backfill abutment slope to the side of the roadway,Rebuiding of the structural sidewalk/bridge class railing along west side.