The Repairs of damaged Element of Ethiope Bridges 1& 2 at CH37+600 along Benin-Sapele road Delta state involved mobilization of […]
The Emergency Rehabilitation of Three(3) nos distressed Bridges along Calabar-Ikom-Ogoja-Gakem Road in Cross River State. involved mobilization of equipment, materials […]
The Culvert is designed to span continuously over three spans and they located on Ch. 0+200 to 0+253.4. The length […]
The project was awarded by University of Jos in 2015 to Zephyrgold. The project consists of the construction of a […]
OSSAP on SDGs awarded Zephyrgold the award for the Construction of I Culvert and Rehabilitation of 2No Culverts and other […]
The construction of Emergency Repair of Embarkment washout of Chanchaji bridge involved mobilization of equipment, materials and labour to site, […]
The project consists of the construction of a footbridge 242.25m long and made up of 17 spans of 14.25m each. […]